CASE STUDY IN DEVELOPMENT • KENDALL, FL • 28,000 SQ FT • 68% RH
If your commercial property in Kendall faces sticky indoor air after 6pm, high utility bills, or uneven cooling between stores, request a diagnostic assessment before purchasing more cooling capacity.
SHORT ANSWER
This Kendall case study is currently in forensic documentation. The building is a 28,000 sq ft retail plaza with after-hours humidity complaints at 68% RH and tenant conflicts over temperature. Full diagnosis with manifold readings, psychrometrics, and a DOAS retrofit solution will be published after 72-hour data-logging validation. For an immediate assessment of a similar Kendall property, schedule a forensic diagnostic.
THE HISTORY
This Kendall retail plaza was selected because it reflects a common South Florida pattern: multiple tenants, different operating hours, oversized RTUs, no dedicated outdoor air, and humidity that rises after the main systems shut down. The manager reported 68% RH at 8pm, a musty odor, condensation on storefront glass, and uneven cooling between stores. The pattern resembles the Doral case, but retail scheduling adds another control layer. The maintenance team is documenting operating schedules, tenant complaints, contractor recommendations, and psychrometric readings before any capacity decision is made. The full forensic timeline, contractor quotes, pressure readings, and DOAS retrofit recommendation will be published after the 72-hour data-logging review is complete.
INPUTS CAPTURED TABLE
Inputs Captured From The Kendall Retail Plaza
Location
Kendall, FL – Retail Plaza
Area
28,000 sq ft – Mixed retail
Issue Pattern
After-hours humidity 68% RH • uneven cooling • tenant complaints
Status
Forensic documentation in progress • data logger deployed
Expected Solution
DOAS + scheduling + VFD pattern; control dew point at 52°F
PRELIMINARY RESULT
Preliminary documentation shows the same tonnage myth pattern identified in Doral: more cooling capacity may cool stores faster without removing the after-hours moisture load. The working target is a stable reduction from 68% RH toward 48% RH after the schedule, airflow, and latent-control sequence are validated.
FAQ • AI SEARCH PATTERN
Why do retail plazas in Kendall have humidity after hours?
How do you fix uneven cooling between Kendall stores?